Follow Vietnam.vn on
Bo De Ward organized a conference to inform the public about the plan to gather opinions on the revised Red River urban zoning plan, scale 1/5000 (section from Hong Ha Bridge to Me So Bridge), and the proposed route for the Red River scenic boulevard, scale 1/500. Photo: Hong Thai
The ward authorities determined that the consultation process would be open, democratic, transparent, and substantive, creating conditions for people to access full information and participate in contributing their opinions.
Public and transparent information on planning.
At the conference, Ms. Nguyen Thi Kim Dinh, Standing Deputy Secretary of the Party Committee of Bo De Ward, reported on the thematic resolution on strengthening leadership in information and communication work and organizing public consultations on the overall adjustment of the Red River urban zoning plan, scale 1/5000 (section from Hong Ha Bridge to Me So Bridge), and the proposed route for the Red River scenic boulevard, scale 1/500. Simultaneously, the ward implemented a thematic information and communication plan on gathering public opinions on the overall adjustment of the Red River urban zoning plan, scale 1/5000, and the proposed route for the Red River scenic boulevard, scale 1/500. Ms. Nguyen Thi Kim Dinh, Deputy Secretary of the Standing Committee of the Bo De Ward Party Committee, reports at the conference. Photo: Hong Thai
Pham Bach Dang, Deputy Secretary of the Party Committee and Chairman of the People's Committee of Bo De Ward, presented the ward's People's Committee plan on organizing consultations with agencies, organizations, individuals, and the community in Bo De Ward regarding the overall adjustment of the Red River urban zoning plan, scale 1/5000, and the proposed route for the Red River scenic boulevard, scale 1/500.
According to the plan of the Ward People's Committee, the process of soliciting opinions must ensure openness, democracy, transparency, and adherence to current procedures, timelines, and regulations. The information, communication, and materials provided to agencies, organizations, individuals, and the community must be accurate, consistent, and utilize official documents and records provided and authorized for public disclosure by competent authorities. Pham Bach Dang, Deputy Secretary of the Party Committee and Chairman of the People's Committee of Bo De Ward, presents the ward's plan for organizing consultations with agencies, organizations, individuals, and the community. Photo: Hong Thai
The process of receiving and compiling feedback must be thorough, objective, and timely; creating favorable conditions for agencies, organizations, individuals, and the community to participate in providing feedback.
Bo De Ward organized a consultation process to gather opinions from individuals and the community in 45 residential areas. The documents were posted and displayed at 5 locations, ensuring transparency and convenience for residents to access, study, and provide feedback.
The consultation period is 20 days, starting from the date the consultation content is made public, from September 7, 2026 to September 26, 2026. Ms. Vu Thi Thanh, Secretary of the Party Committee and Chairwoman of the People's Council of Bo De Ward, presided over and conducted the meeting. Photo: Hong Thai
Focus on information relevant to the local area.
Concluding the conference, the Party Secretary and Chairwoman of the People's Council of Bo De Ward, Vu Thi Thanh, emphasized that the adjustment of the Red River urban zoning plan needs to be viewed within the overall development orientation of the Capital City, and at the same time, placed in direct relation to the development process of Bo De Ward. For Bo De Ward, one of the issues that needs special attention is the direct impact of the Red River scenic boulevard.
According to the records, the section passing through Bo De Pagoda is approximately 4.9km long, divided into 4 segments. Specifically, the bridge over the Duong River is about 1km long with a 60m wide cross-section; the bypass route around Rung Temple, Mau Thoai Temple, and Duc Ong Temple is about 1.2km long and 49.5m wide; the tunnel under the Long Bien Bridge - Chuong Duong Bridge area is about 1.3km long and 55.5m wide; and the section from Chuong Duong Bridge to the Tran Hung Dao Bridge intersection is about 1.4km long and 73.5m wide, bypassing Bo De Pagoda. Ms. Vu Thi Thanh, Secretary of the Party Committee and Chairwoman of the People's Council of Bo De Ward, speaks at the conference. Photo: Hong Thai
The total area identified as being affected by the route through Bo De is approximately 31.46 hectares. This is one of the important issues that needs to be clarified during the consultation process, reaching each residential group, neighborhood, land group, and affected structure.
Another issue requiring extreme caution concerns Bac Cau village. According to records, Bac Cau village in Bo De ward covers an area of approximately 35.5 hectares, with about 10,000 inhabitants and 3,240 households slated for complete relocation under the flood control plan.
This issue directly affects the lives of a large number of people; therefore, clear information is needed regarding the basis for relocation, the scope, implementation schedule, relocation project, resettlement area, people's rights, compensation and resettlement policies, land acquisition timeline, and the construction and repair of houses during the waiting period. Along with this is the issue of preserving the cultural and historical values of the North Cau area.
According to the general plan, Component Project 16 is identified as the Long Bien - Bo De Residential Urban Area and the Long Bien - Bo De - Bat Trang Multi-Purpose Urban Area. The dossier also identifies an urban development land area in Bo De ward.
Therefore, urban planning in Bodhi needs to be viewed in the context of relocation, resettlement, reconstruction, landscaped avenues, parks, multi-purpose urban areas, and new transportation infrastructure systems, rather than solely from the perspective of road construction. Conference scene. Photo: Hong Thai
Ensuring the people's right to know and to contribute their opinions.
In addition to the above, according to Vu Thi Thanh, Secretary of the Party Committee and Chairwoman of the People's Council of Bo De Ward, the ward has identified the protection of historical relics as a top priority. The proposed route through Bo De reflects the principle of avoiding the areas of Rung Temple, Mau Thoai Temple, Duc Ong Temple, and Bo De Pagoda.
Another important requirement is to review the internal transportation system. Besides identifying the scenic boulevard route, it is necessary to clarify the connectivity of Bodhi residents from their residential areas to the boulevard and other main transportation routes... Information disseminated to the public must be accurate, consistent, and easy to understand . Photo: Hong Thai
The People's Committee of the ward is responsible for providing complete and public information to the residential groups regarding the time and location of posting; creating conditions for people to access documents, diagrams, maps, and the main contents of the planning adjustment plan; honestly receiving and recording opinions and promptly compiling them on schedule to report to the competent authority.
Following the conference, neighborhood groups were instructed to immediately begin preparations; review the participants, documents, and location; proactively monitor public sentiment; and specifically assign roles for chairperson, presenter, minutes recorder, opinion summarizer, and contact person for answering questions. Any issues arising that exceed their authority must be promptly reported to the Party Committee and the People's Committee of the ward for unified direction.
The ward authorities determined that the consultation process should be conducted in a transparent manner, ensuring that residents are informed, that explanations are provided to help them understand, that residents' opinions are listened to, and that the feedback is honestly compiled for consideration by the competent authorities. This contributes to the refinement of the planning scheme, while simultaneously strengthening trust and fostering consensus among the people.
The files are posted and displayed at 5 locations:
1. Bo De Ward Cultural, Information and Sports Center, 101 Ai Mo Street, Bo De Ward. 2. The community cultural center is located at alley 39, Nguyen Gia Bong Street (formerly Community Cultural Center No. 17, Ngoc Thuy cluster). 3. The headquarters of the Community Cultural Center of residential area No. 2, Bo De ward, No. 107 Phu Vien street. 4. Headquarters of the Community Cultural Center No. 34, Bo De Ward, No. 1, Alley 295, Ngoc Thuy Street.
5. Headquarters of the Community Cultural Center No. 44, Bo De Ward, No. 10/80 Bac Cau Street.
Source: https://hanoimoi.vn/phuong-bo-de-lay-y-kien-nhan-dan-ve-dieu-chinh-quy-hoach-phan-khu-do-thi-song-hong-1706316.html
(0)Comments